Here is the main bathroom. Again the pictures were a little difficult to take because of the narrowness. It is very neutral, but that was planned. The ceramic tile and wall color will also be done in the 3/4 bathroom.
We took off the old marble looking formica and replaced it with a different look.
I love how the ceramic tile turned out. Andy did a fantastic job!! The only thing I was really responsible for was priming and painting the walls. :)
No comments:
Post a Comment